Chapter 1: How to Get Results Fast – Lessons Learned from a Disaster
The Disaster
The Mess
Lesson One: Find the Constraint
Lesson Two: Subordinate to the Constraint with Standard Work
Lesson Three: Exploit the Constraint – Measure What Matters
Lesson Four: Elevate the Constraint – Small Wins, Big Flow
Lesson Five: Break Policy Constraints – Question the Status Quo
Lesson Six: Sync the System – Fast Fixes, No Noise
Part 1: Concepts and Foundations
Chapter 2: Why Your Plant’s a Mess – The ToC Wake-Up Call
Seeing Your Plant as a System
Why Your Plant Faces These Challenges
The Power of the Constraint
A Path Forward with ToC’s Five Focusing Steps
Looking Ahead: Turning Theory into Action
Chapter 3: How ToC Tames the Chaos – Production Solutions That Work
Section 1: The Tools That Fix Your Flow
Section 2: How These Tools Tame Your Plant
Section 3: How ToC Sets You Free
Chapter 4: Start Here; Find the Constraint
Step 1. Spot the Symptoms
Step 2: Follow the Trail
Step 3: Unmask the Real Constraint
Pitfalls and the Payoff
Chapter 5: Conserving Human Capital
The Imperative of Strategic Flexibility
Conflict in Efforts Towards Ongoing Improvement
Preserving Human Capital Through Market Segmentation
Changing the Perception of Value for Competitive Advantage
Operational Strategies for Flexibility
Strategic Flexibility Prepares You for the Future
Chapter 6: Make Better Decisions with Empirical Data
The Need for Data-Driven Decision Making
How Can Throughput Accounting Help?
The Decision Maker's Dilemma
Throughput Accounting in Practice
Summary
Part 2: The Theory of Constraints Production System
Chapter 7: Linking Behavior to Data-Driven Results
The Problem: Production is Misaligned
The Rationale: Behavior Drives Results
The CCR Command Center: A Behavioral Framework
Conflict Resolution: Keeping the Flow
Linking Theory to Practice
Summary
Looking Ahead
Chapter 8: Designing for Reliability, Resilience, and Profit
Power Play: Where's Your Constraint?
CCR Choice Rules: Crafting Your Advantage
CCR vs. Control Point: Precision in Design
Profit Math: Data Shapes Destiny
Flow Fit Rules: Design Meets Reality
The Best Place to Place Your Constraint
The CCR is Your Strategic Foundation
Chapter 9: Beyond Kanban Systems for Resilience
Demand-Pull Keeps Your Line Flowing
An Overview of the Demand-Pull System
What Goes Wrong: The ERP Trap
Setting Up Buffers: Your Flow Protector
Putting Demand-Pull into Action
Beyond Kanban: The Strategic Edge
The Profit Math
Closing: Your Replenishment Advantage
Chapter 10: Designing a Resilient Production System
Setting the Stage: Performance Goals and the Chaotic Reality
ToCPS for All Manufacturers: Accessible and Adaptable
The ToC Production System: A Closed-Loop Blueprint
Building Resilience: Protective Mechanisms
System Components: The Organizational Backbone
Bringing It to Life: The Strategic Edge
Chapter 11: Planning for Resilience: Demand and Capacity
Planning’s Role in Resilience
Overview of the ToCPS Planning Process
Business Planning: Setting Strategic Goals
Demand Planning: Forecasting Market Needs
Capacity Planning: Reconciling Demand with Capabilities
Bringing It to Life: A Resilient Plan
Chapter 12: Delivering With Precision: Production Planning and Scheduling
The Role of Production Scheduling in Delivery and Resilience
Production Schedules: Setting the Pace with the CCR
Schedule Accountabilities
Loading the Resources
Production Planning and Buffers: Optimizing Flow
Production Schedules
Prerequisites for DBR Scheduling: Building the Foundation
Building the DBR Schedule: Step-by-Step
The Profit Math
Closing: Your Scheduling Advantage
Chapter 13: Executing a Resilient Production System – Delivering on the Plan
Execution Management: Turning Plans into Reality
Battle Rhythm – Achieving the Schedule
Managing Priorities: A Single, Transparent System
Controlling Work in Process
Monitoring Planned Load to Manage Capacity
Promising Deliveries
Managing Change
The Profit Math
Closing: Mastering Execution to Launch Implementation
Part 3: Implementing the ToC Production System
Chapter 14: The Approach: Preparing Your Mind and Team for Transformation
Why Should You Change?
Pursuing Perfection is a Waste: Focus on What Matters
Start Small, Win Early: Build Momentum with Micro-Projects
Managing is Not Chaotic: Standardize for Consistency
Spark a Culture Ready for Change
Your Team is Hungry for Innovative Leadership: Champion the Change
The Journey Ahead: Your Springboard to Excellence
From Vision to Action: The ToCPS Roadmap
What’s Next: Your Transformation Journey
Chapter 15: Aligning for Success
Setting Up for Success
Education/Knowledge
Choose the CCR
New Metrics
Organizational Alignment
Disregard Old Metrics
Conclusion
Chapter 16: Building Reliability: Designing Execution Processes
Elements of Building Reliability
Production Planning
Moving on to Execution Processes
Managing Execution
Managing Execution Summary
Chapter 17: Thriving Through Resilience
Capacity Management
Increasing CCR Productivity
Improving Product Mix
Summary
Implementation Plan Closing
Chapter 18: Sustaining the Shift
Making the New Process a Habit
Make the Process Difficult to Change
In Closing
Chapter 19: I Haven’t Told You Everything, But This Should Be Enough
Your ToCPS Journey: From Strategy to Customer Value
Continuing the Journey: A Process of Ongoing Improvement
This Book is Your Practical Guide
In Closing: Your ToCPS Legacy
Appendix A: Work Breakdown Structure (WBS) for a ToCPS Implementation Plan
Appendix B: Case Study – Brown Fintube’s Turnaround with Drum-Buffer-Rope
Appendix C: Case Study – Spirit AeroSystems’ ToCPS Implementation
Appendix D: Leveraging Lean and Six Sigma for More Success
Appendix E: Theory of Constraints Production System SIPOC Diagrams
Bibliography
Index